Spring Street Reconstruction – Phase I (continued)
From Main Street (Route 159) to Volunteer Drive | Approximately 1.0 mile
Project Description
Spring Street is an important connector between the Main Street downtown corridor and surrounding residential neighborhoods. This project addresses deteriorating roadway conditions and failing underground drainage infrastructure through comprehensive roadway reconstruction.
The project encompasses approximately 1.0 mile of Spring Street between Main Street and Volunteer Drive. Approximately 0.4 miles, extending from West Street to Volunteer Drive, has already been designed and reconstructed using Town funds. The remaining approximately 0.6-mile section, from Main Street to West Street, is the subject of the current design effort.
The section of Spring Street between the West Street and Volunteer Drive intersections was reconstructed in 2025 and 2026. This work included replacement of the existing drainage structures at the West Street intersection with larger structures to improve drainage capacity and provide better sedimentation control. Additional improvements included upgrades to sidewalk ramps to meet ADA accessibility requirements, installation of pedestrian signals, milling and paving of the existing roadway, and installation of new pavement markings.
Improvements to Spring Street from Main Street to West Street will include replacement of failed underground drainage systems, upgrades to sidewalks to meet current ADA accessibility requirements, and full-depth reconstruction of the existing roadway.
These improvements will address longstanding infrastructure deficiencies while improving pedestrian accessibility, roadway safety, and stormwater management. The project also supports the broader downtown revitalization effort by improving access between Main Street, adjacent residential neighborhoods, and the surrounding street network.
Project Status
The approximately 0.4-mile section between West Street and Volunteer Drive has been completed using local Town funds. Tighe & Bond is currently designing the remaining approximately 0.6-mile section between Main Street and West Street. Design of the remaining section is in the preliminary design phase approaching 30% completion.
A public information meeting will be scheduled when the project reaches approximately 60% design. The meeting will provide an opportunity to present the proposed plans to the public and solicit feedback for consideration during the design process.
The Town continues to seek additional funding through various grants, including State and Federal funding sources.
| Current Expenditures | $1.8 million (as of August 21, 2026) |
| Estimated Remaining Project Cost | $4.2 million (as of August 21, 2026) |
| Current Funding Available | Approximately $3.5 million (local funds) |
| Additional Funding Needed | Approximately $1 million |
Spring Street Reconstruction – Phase II
From Volunteer Drive to Ella Grasso Turnpike (Route 75)
Project Description
This project will extend the Town’s Spring Street infrastructure improvements from Volunteer Drive to Route 75, providing a comprehensive upgrade to an important roadway connecting Windsor Locks neighborhoods with the regional transportation network.
The project will address deteriorating roadway conditions and deficient underground drainage infrastructure through full-depth roadway reconstruction and replacement of failed drainage systems. Additional improvements will include ADA-compliant sidewalks and traffic-calming measures designed to improve pedestrian safety and reduce vehicle speeds.
Together, Phases I and II will provide a continuous corridor of improved roadway and pedestrian infrastructure between Main Street and Route 75. These improvements will enhance neighborhood connectivity, improve access to the downtown TOD development and train station, and provide safer pedestrian connections throughout this portion of Town.
Project Status
Conceptual design has been completed. The Town has submitted a grant application under CT DOT’s Local Transportation Capital Improvement Program (LOTCIP). The project has been approved by the CRCOG Transportation Committee and is awaiting approval by the Connecticut Department of Transportation and subsequent commitment to fund under LOTCIP. Cardinal Engineering Associates is progressing with the preliminary design.
A public information meeting will be scheduled when the project reaches approximately 60% design. The meeting will provide an opportunity to present the proposed plans to the public and solicit feedback for consideration during the design process.
The Town continues to seek additional funding through various grants, including State and Federal funding sources.
| Estimated Project Cost | $7 million (as of February 18, 2026) |
| Current Funding | $5 million (LOTCIP, anticipated) |
| Additional Funding Needed | Approximately $2.5 million |
Main Street Complete Streets Project
Route 159 – Project L165-0002 | From North Street to Oak Street
Project Description
The Main Street Complete Streets project is a central component of Windsor Locks’ downtown revitalization and Transit-Oriented Development initiative. The project will redesign and reconstruct the Main Street corridor between North Street and Oak Street, including the area surrounding the new Windsor Locks train station and the 255 Main Street TOD development.
The project is intended to transform Main Street into a safer, more accessible, and more attractive downtown corridor that accommodates motorists, pedestrians, cyclists, and transit users. Improvements will include pedestrian safety enhancements, raised crosswalks, center medians, on-street and adjacent parking, rectangular rapid flashing beacons (RRFBs), drainage improvements, roadway realignments, and full-depth roadway reconstruction.
These improvements will establish safer pedestrian connections between the new residential development, the train station, downtown businesses, and surrounding neighborhoods. Improved pedestrian and bicycle facilities will help connect residents to regional rail service and local destinations while encouraging activity in the downtown commercial district.
The project also addresses existing roadway deficiencies and provides an opportunity to improve traffic circulation, parking, and the overall streetscape. By coordinating transportation infrastructure improvements with the new TOD development, the Town can establish a more cohesive downtown environment that supports additional housing, economic development, and increased transit utilization.
Project Status
Approximately 30% design has been completed by Fuss & O’Neill. The project has received state and regional funding support through the Local Transportation Capital Improvement Program (LOTCIP). The Town is pursuing additional funding to address anticipated cost increases as design advances and to complete construction.
A public information meeting will be scheduled when the project reaches approximately 60% design. The meeting will provide an opportunity to present the proposed plans to the public and solicit feedback for consideration during the design process.
| Estimated Project Cost | $7.7 million |
| Current Funding | $6.5 million |
| Additional Funding Needed | $1.2 million |
Old County Road Pedestrian Improvements Project
Old County Road | From Elm Street (Route 140) to Halfway House Road
Project Description
The Old County Road Pedestrian Improvements Project will enhance pedestrian safety and accessibility along Old County Road between its intersection with Elm Street (Route 140) and its intersection with Halfway House Road.
The project includes the construction of additional sidewalk, installation of surface-grade crosswalks and a Rectangular Rapid Flashing Beacon (RRFB) at Elm Street, and a new raised mid-block crosswalk with an RRFB near Candlewood Suites. Additional improvements include a raised intersection and enhanced stop control at Halfway House Road, along with improved signage at pedestrian crossings.
These improvements are intended to create safer pedestrian crossings, improve accessibility, and enhance traffic safety along this section of Old County Road. The project will also improve pedestrian connectivity within the surrounding area and support the Town's continued efforts to make its transportation network safer and more accessible for all users.
Project Status
The project is currently in the preliminary design phase. The Town has been awarded $800,000 through the Connecticut Department of Transportation's Community Connectivity Grant Program to fund the improvements.
A virtual public informational meeting is scheduled for December 3, 2026, at 6:00 p.m. Project information will be made available on the Town's website on or after that date. The public will have an opportunity to review the proposed improvements and submit comments, questions, and concerns within 14 days following the presentation.
| Estimated Project Cost | $800,000 |
| Current Funding | $800,000 |
| Additional Funding Needed | $0 |
Documents
Public Information Meeting Notice - Old County Road Pedestrian Improvements
Moisture Mitigation at the David Pinney Barn
Project Description
The David Pinney Barn and the adjacent Noden Reed Park were left to the Town of Windsor Locks by Gladys Reed in 1967. As part of the terms of the bequest, the Town is responsible for maintaining the barn. Specifically, Gladys Reed's Last Will and Testament states that the "Town of Windsor Locks will keep in repair and maintain in a good state and condition the brick barn located on said premises." This project represents the Town's continued fulfillment of that responsibility by addressing moisture intrusion and deterioration to help preserve the barn for future generations.
The Moisture Mitigation at the David Pinney Barn project addressed ongoing moisture intrusion and drainage issues affecting the historic building. The project included improvements to the building's roof drainage system, installation of underground drainage infrastructure, and targeted restoration of deteriorating masonry.
The improvements included replacement of the existing gutters and connection of roof leaders to an underground drainage system. Underground drainage was installed around the entire building and discharges to a level spreader. The project also included excavation and damp-proofing of select interior and exterior walls, along with replacement of select areas of deteriorating brick masonry both below and above ground.
These improvements were intended to reduce moisture intrusion, improve the management of stormwater around the building, and protect the structural integrity and historic character of the David Pinney Barn. The work helps preserve an important Town property by addressing conditions that could contribute to continued deterioration if left uncorrected.
Project Status
The project was designed by Crosskey Architects, LLC, and construction was completed by Kronenberger and Sons Restoration, LLC. The project was advertised for bid in April 2026, with construction completed in October 2026.
The project was bid with a base bid and seven alternates to provide flexibility in determining the scope of work based on available funding. Due to funding constraints, the Town proceeded with the base bid, Alternate 1, Alternate 2A, and Alternate 2B. Alternates 3 through 7 were eliminated from the bid award due to insufficient funding. The Town will continue to pursue additional funding opportunities to complete the remaining work associated with the project as funding becomes available.
| Estimated Project Cost | $364,628 |
| Current Expenditures | $345,942 |
| Additional Funding Needed | $325,000 |